Site readiness guide

Prepare permitting and installation before production begins.

Permitting and installation should shape the plan—not appear as last-minute steps. Early coordination reduces redesign, schedule surprises, and unclear responsibility between the church, sign provider, electrician, and site contractor.

Discuss your project
01

Confirm jurisdiction and rules

The governing authority may be a city, county, planned development, landlord, or several of these.

  • Identify the reviewing jurisdiction
  • Confirm sign area, height, setbacks, and placement
  • Review illumination and electronic-message restrictions
  • Ask about drawings, engineering, and application requirements
02

Assign responsibilities

Document who supplies information, approvals, utilities, access, and field work.

  • Property owner authorization
  • Permit application and fees
  • Survey, engineering, and sealed drawings
  • Electrical connection, inspections, and utility locating
03

Prepare the site

Installation is more predictable when field conditions are confirmed before scheduling.

  • Mark utilities and irrigation
  • Verify access for equipment and delivery
  • Confirm foundation and electrical readiness
  • Plan traffic, parking, landscaping, and restoration
04

Close out the project

A complete handoff gives the church the information needed to operate and maintain the sign.

  • Final inspection and permit closeout
  • Photo documentation
  • Operating and content-management guidance
  • Warranty, service contacts, and spare-component records

Put this guide into action

Continue with the service that fits your next decision.

Committee checklist

Bring these items to the first planning conversation.

Common questions

What church teams ask before moving forward.

Can production begin before the permit is approved?

It is safer to wait until required approvals are secured. Producing too early can create expensive changes if the authority modifies size, placement, structure, or illumination.

Who normally provides electrical service?

Responsibility varies by project. The proposal should state whether the sign installer, a licensed local electrician, the general contractor, or the church provides circuits, disconnects, trenching, and final connection.

What can delay installation?

Common causes include permit timing, weather, utility conflicts, incomplete foundations or electrical service, equipment-access limitations, and late artwork or message approvals.